Build, publish, and deploy MCP servers
MCPWorks separates editable drafts from published versions and environment deployments. A publish creates a signed, content-addressed version; it never mutates an existing published digest.
Lifecycle objects
| Object | Purpose |
|---|---|
| Server | Stable identity and ownership boundary for a managed MCP server. |
| Draft | Editable tools, schemas, connectors, credential references, and runtime requirements. |
| Published version | Validated, signed, content-addressed bundle stored in the registry. |
| Environment | Promotion boundary such as development, staging, or production. |
| Deployment binding | Desired server version assigned to a runtime target. |
| Runtime status | Observed version, readiness, sessions, and rollout state reported by runtime cells. |
Create and validate a draft
Create the server, pull its draft, edit the local representation, validate it, and push the revision:
mcpctl server create SERVER --display-name "SERVER NAME"
mcpctl draft pull SERVER ./SERVER
mcpctl validate ./SERVER
mcpctl draft push ./SERVER
Use mcpctl <group> <action> --help for file and revision flags. Validation should reject unresolved credential
references, invalid schemas, unsupported runtime requirements, and policy or supply-chain findings that block a
release.
Publish a version
Publish only after validation succeeds:
mcpctl publish SERVER
Record the returned version and bundle digest. Publishing signs the bundle and places it in the configured registry; it does not deploy it. Never replace registry content at an existing digest or reuse a version identifier for different content.
Promote and deploy
Promote the exact version to an environment and wait for reconciliation:
mcpctl promote SERVER --env ENVIRONMENT --version VERSION --wait
mcpctl status SERVER
Where the environment requires approval, the promotion remains pending until an authorized reviewer decides it. After a runtime cell reports the expected digest ready, configure or update the DVARA MCP Gateway route and make a read-only test call with a scoped identity.
Verify the server version, runtime digest, Gateway decision, tool result, and audit evidence before increasing traffic.
Roll back
Use the rollback command to return to the version the environment served previously, or name another published version explicitly:
mcpctl rollback SERVER --env ENVIRONMENT --to-previous --wait
# or
mcpctl rollback SERVER --env ENVIRONMENT --version VERSION --wait
Do not rebuild the old version or rewrite its bundle. Drain sessions where the connector or protocol cannot safely move them between versions.
A server-version rollback is different from a binary rollback of the Control Plane or runtime. Before reverting a binary, confirm that it accepts the current data and bundle formats.